Kitchen design
The plan first. Where you stand, what you reach for, and how many people are in there at once.
We start with how the room is used rather than with a style. How many cook at the same time, whether the bins are the thing that always gets in the way, which cupboard you open thirty times a day. That conversation produces the layout, and the layout is what you live with long after you have stopped noticing the door fronts.
The kitchen you have now
An hour in your existing kitchen, while you cook if possible. We are watching where you stand and what annoys you, which you will have stopped noticing.
Two layouts, not twelve
We draw two genuinely different plans rather than twelve variations of one. Choosing between two is a decision; choosing between twelve is a fog.
The quote
Itemised by cabinet, worktop, appliance and labour, so you can see what a change actually costs rather than being told the total moved.
Fit
Ten to fourteen days for a typical kitchen. Same two fitters throughout, first fix sequenced inside our programme.
Template and finish
Worktops templated once the units are in and levelled, fitted a week later, then the snag list walked with you rather than posted to you.
Asked often
How long is the kitchen out of action?
Why template the worktops on site?
Do I have to buy the appliances from you?
Is a kitchen island always a good idea?
Cabinetry
Made to the room rather than to a catalogue module, where the room needs it.
Worktops
Templated on site once the cabinets are in and levelled, never cut from a drawing, because no wall in an English house is actually straight.
Installation
Our own fitters, with the plumbing and electrics sequenced around them.